Hi all, good job last week with the start of sub floor. The house is staring to take shape. Hopefully all the joists will be down by the end of the week.
Hi everybody, yap lets finished the joists this week not much time left,We can do it . Have a great time see you all on wednesday with a rain coat . :-)
I was wondering if its possible to temp peg a boundary joist on 1 side to keep it align while the other side can mark and cut the joist? Wondering would that be the way to go.. since our floor joist can go out of shape since two group continuously working on the own 'half' of the house?!
4 comments:
Hi everybody, yap lets finished the joists this week not much time left,We can do it . Have a great time see you all on wednesday with a rain coat . :-)
I was wondering if its possible to temp peg a boundary joist on 1 side to keep it align while the other side can mark and cut the joist? Wondering would that be the way to go.. since our floor joist can go out of shape since two group continuously working on the own 'half' of the house?!
Hi Steve .I think it will be ok if we finish one joist,then move to next one. Anyway C U 2marrow
Sorry I've been away sick lately, hope things are goin well on the house and the sub floors coming together well. Catch every1 tomorrow